欧美日韩在线成人免费-欧美日韩在线成人看片a-欧美日韩在线不卡-欧美日韩在线播放-自拍偷拍三级-自拍偷拍欧美亚洲

Welcome to Changxing Baodi Environmental Protection Technology Co., Ltd!

中文版 | English
 
Your current position: Home >> Changxing atomic ash manufacturer explains the use of atomic ash in coating process

Changxing atomic ash manufacturer explains the use of atomic ash in coating process


 1. Requirements for workpiece to be coated with atomic ash

 
The primer of the workpiece to be scratched must be dry; There shall be no oil, dust and other dirt. These three items are the minimum requirements for coated and scraped workpieces.
 
If the primer is not dry enough, the solvent in the primer cannot continue to volatilize after scraping the atomic ash and curing, and is sealed under the atomic ash layer. In case of high temperature, bubbles are easy to peel off. If there is oil and dust, the adhesion between the atomic ash layer and the primer will be affected, and the atomic ash layer will fall off seriously.
 
2. Preparation and conventional coating of atomic ash
 
Preparation of atomic ash: it shall be prepared according to the requirements in the product operation manual. The main ash and curing agent must be mixed evenly before use.
 
The ratio of curing agent to main ash is generally 2:100, but it can also be adjusted within the range of (1.5 ~ 3): 100 according to the temperature and actual operation. Too much or too little curing agent may cause adverse effects.
 
Scraping and coating atomic ash is a link with high technical requirements in the coating process. It is required that the surface of the workpiece after coating and scraping shall be as flat as possible, and the coating and scraping defects - sand holes, scratches, wild paste and other defects shall be minimized. Generally, atomic ash shall be coated and scraped for 3 ~ 4 times. The following is a brief description of the operation requirements of each pass.
 
Apply the first coat of atomic ash
 
The purpose of the first layer of atomic ash is to fill and scrape large pits. It is painted and scraped with a wide hard scraper, only for leveling, not for smoothness. It is not allowed to scrape back and forth many times during operation, so that the pores in the atomic ash are stuck, which will cause long-term non drying and affect the construction. When applying and scraping, the scraper shall form an angle of 60 ° with the surface of the coated object, and apply and scrape slightly in an arc. Grind after drying, remove the floating ash, and then carry out the second layer of atomic ash.
 
Apply the second layer of atomic ash
 
The purpose of the second layer of atomic ash is still to fill the low recesses. The coating thickness shall be less than that of the first layer. A hard scraper shall be used for the plane, and a rubber scraper can be used for the round bend. When applying and scraping, pay attention to the horizontal direction of the car shape; From right to left, from top to bottom; In order to reduce the coating and scraping interface, the coating and scraping shall be lengthened as much as possible, and the construction requirements shall mainly level the low part.
 
Grind after drying, remove the floating ash, and then carry out the third layer of atomic ash.
 
Apply the third layer of atomic ash
 
The purpose of the third layer of atomic ash is mainly to scrape the pores, sandpaper marks and small depressions left by the previous layer of atomic ash. Smooth and smooth during coating and scraping. Scrapers with good elasticity shall be used during construction, and certain pressure shall be applied to make the scraped atomic ash layer smooth and less pores. Grind smooth after drying, and conduct the fourth layer of atomic ash after cleaning the surface.
 
Apply the fourth layer of atomic ash
 
The role of the fourth atomic ash is basically the same as that of the third atomic ash. It can also be called "fine scraping atomic ash". It is required to dilute the atomic ash and fully apply it once, so that the outer surface of the whole vehicle body can be thinly, smoothly and evenly coated with a layer of atomic ash.
 
Only the workpiece qualified by the above treatment can enter the next process - intermediate coating.
 
Coating defects caused by improper use of atomic ash
 
The finishing coat is the last process in the automobile coating process.
 
If there is a problem after finishing, it is the most troublesome. The following is a brief introduction according to the problems in production.
 
(1) The top coat foams after baking
 
Scrape off the bubbles after the bubbles in the finish coat, and see which layer the bubbles are on. If the bubbles appear in the primer layer, the atomic ash is well combined with the primer, and the substrate treatment may not be in place; After blowing off the bubbles, it is found that there is a layer of primer on the atomic ash and the substrate, then the primer may be too thick or the primer may not be completely dry.
 
(2) Pinholes and depressions appear after baking the finish paint
 
First, consider whether the atomic ash itself causes pinhole quality problems.
 
Secondly, if pinholes appear when the quality of atomic ash is qualified, it is generally because the atomic ash scraping and grinding technology is poor and the sand holes are not handled well.
 
In addition, during the scraping process, if the scraping tool is improperly selected, it will also cause pinholes.
 
(3) "Prickle" after baking the finish coat
 
First, the climate is too humid and the water absorption of atomic ash is too large. The polished atomic ash adsorbs a considerable amount of water. The finish paint is sprayed before the water volatilizes. A small amount of water is sealed under the paint film. Once heated, the water volume expands sharply, breaking through the paint film to form "prickly heat".
 
Second, the water absorption of atomic ash is qualified. After hot air drying, spray the finish coat, and "prickly heat" appears after baking. Then it may enter the drying room before the solvent volatilizes fully after spraying the finish coat. In this way, due to the rapid closure of the finish coat surface, the residual solvent has to break through the paint film to form "prickly heat". Of course, it may also be the quality problem of the topcoat, or the "prickly heat" caused by the mismatch between the polarity of the solvent and the topcoat.


PrevWhat are the advantages of mechanical atomic ash
NextMatters needing attention in the use of atomic gray modulation

Copyright © 2020 Changxing Baodi Environmental Protection Technology Co., Ltd all reserved Web Admin --> >>

浙公網(wǎng)安備 33052202000243號(hào)?浙ICP備17019658號(hào)

主站蜘蛛池模板: 好吊妞人成免费视频观看| 里番无码在线侵犯| 又黄又硬又爽国产在线观看| 亚洲婷婷中文字幕新娘装精品| 无码人妻一区二区三区在线视频后妈裙 | 国内国外日产一区二区福利| 俺去俺来也www色官网免费的| 亚洲黄色在线网站网站视频| 精品中文av一区 | 国产男女一区二区裸体插爱| 亚洲中文字幕av无码人妻| 久久无码内射区| 中文字幕一区二区视频一区二区亚洲| 小草青青电视剧全集免费观看| 精品国产天线91| 亚洲熟妇av一区网址| 久久久久亚洲精品中文八戒简爱 | 亚洲精品尤物在线自然| 精品偷自拍另类在线观看网址| 宅男三区视频在线| 久久人做人爽一区二区三区aaaaaaa| 97久久超碰日韩精品 | 日韩色欲aV一区二区精品视频 | 97人妻无码| 人妻中文字幕久久八戒| sedou视频国产精品| 三上悠亚亚洲一区二区教员 | 久久久久人妻一区精品色火影忍者 | 色噜噜在线视频下载| 成人啪啪激情狼友爱爱99| 丝袜美腿三区资源| 中文字幕内射无码视频在线观看 | 亚洲欧美日韩中文字幕dvd久久| 狠狠色成人一区二区三区樱井 | 99久久综合精品国产首员无码男同| 色拍拍综合网亚洲色拍拍| 3d成人H动漫在线网址| 久久久久久久久久9九| 亚洲精品成人片在线播放43| 成人乱码一区二区三区AV77777 | 一本色道久久综合狠狠躁篇怎么玩|